Tully Project

Mineable – Expandable – Explorable

A high-grade underground gold asset in the heart of the Timmins camp

Indicated
164,000 oz Au 1.62 Mt at 3.16 g/t Au
Inferred
62,000 oz Au 0.95 Mt at 2.03 g/t Au
Location
Timmins, Ontario 25 km northeast of the city
Next milestone
PEA, December 2026 Target date

2026 Mineral Resource Estimate, effective June 15, 2026, at a 1.1 g/t Au cut-off. Mineral Resources are not Mineral Reserves.

Overview

Tully is located approximately 25 km northeast of Timmins, within the Timmins-Porcupine Gold Camp, which includes the Dome and Hollinger mines. The project is approximately 2 km southwest of the Bradshaw Gold Project of Gowest Gold Ltd.

The 458-hectare property includes one leased mining claim and 11 patented mining claims.

Project status

  • Mineral Resource Estimate completed, July 2026
  • Preliminary Economic Assessment underway, December 2026 target
  • Permitting activities underway
Regional map showing the Tully project northeast of Timmins, Ontario
Tully in the Timmins camp.

Geology

Prospective structures splay off the Porcupine-Destor Fault through the Tully area. Mineralisation at Tully occurs within a 30 m wide mafic volcanic unit with an approximate west-southwest strike and steep northerly dip. The hanging wall consists of sedimentary rocks and the footwall consists of ultramafic rocks.

As currently understood, the deposit comprises an array of shallowly inclined quartz-carbonate veins or lenses stacked 'ladder-style' within the volcanic rocks and constrained by its hanging wall and footwall contacts. The higher-grade core of the deposit extends over 600 m along strike and 400 m down dip, and plunges moderately toward the east-northeast. The mineralised veins/lenses host gold primarily within irregular pyrite clusters and also commonly as free visible gold.

The Tully property occurs within a swampy area and is covered by a blanket of glacial drift, averaging 30 m thickness, which hid the deposit from early explorers; thus, the geology is entirely derived from drillhole and geophysical data.

Cross-section 6350 looking west, showing mineralized zones stacked within the mafic tuff, between hanging wall sediments and foot wall ultramafics, with drill holes from surface
Section 6350, looking west (25 m clip width). Mineralized zones Mafic tuff Foot wall ultramafics Hanging wall sediments
Property geology map of the Tully project showing clastic sediments, ultramafic and mafic volcanics, a felsic intrusion, pipestone and faults, with the Tully deposit marked on the mafic volcanic unit
Property geology of the Tully Gold Project.

Mineable

The 2026 NI 43-101 Mineral Resource Estimate, and a higher-grade core that remains robust under stope constraints.

2026 Mineral Resource Estimate

2026 Tully Gold Property Mineral Resource Estimate with an Effective Date of June 15, 2026.

Resource classification Au cut-off (g/t) Tonnes (k) Au (g/t) Contained Au (koz)
Indicated 1.1 1,620 3.16 164
Inferred 1.1 948 2.03 62

Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Grade-tonnage sensitivity

Higher-grade core remains robust under stope constraints

Cut-off (g/t Au)
View
Long section looking north of the Tully block model at a 1.1 g/t Au cut-off
Indicated tonnes
1,014 kt
Grade
4.80 g/t Au
Contained gold
156 koz

Stope-constrained sensitivity, for illustrative purposes only. Not a new or updated Mineral Resource Estimate.

Cut-off grade (g/t Au) Classification Tonnes (kt) Grade (g/t Au) Contained Au (koz)
3.00Indicated4079.19120
Inferred1506.4531
2.50Indicated5007.98128
Inferred2055.4336
2.00Indicated6336.78138
Inferred3134.3444
1.50Indicated8245.61149
Inferred4363.6051
1.10Indicated1,0144.80156
Inferred6042.9657

Grade-tonnage sensitivities for the underground Mineral Resource Estimate using a range of reporting cut-off grades from 1.1 to 3.0 g/t Au. The sensitivity analysis is based on the mineralized material within the stope shapes generated using a 1.1 g/t Au cut-off grade and a minimum mining width of 1.25 metres. The results are presented for illustrative purposes only and do not constitute a new or updated Mineral Resource Estimate.

The base-case Mineral Resource Estimate reported in the Technical Report, at a 1.1 g/t Au cut-off grade without the additional stope-width constraint shown above, consists of an Indicated Mineral Resource of 1.62 million tonnes grading 3.16 g/t Au containing 164,000 ounces of gold, and an Inferred Mineral Resource of 0.95 million tonnes grading 2.03 g/t Au containing 62,000 ounces of gold.

Expandable

Open along strike and at depth, with published intercepts outside the Indicated block.

Selected published intercepts outside the Indicated block

Drilling by SGX Resources, 2010 to 2013.

Long section of the mafic tuff looking north, with selected published SGX intercepts marked outside the Indicated block. The values are listed in the table below.
Mafic tuff, looking north. Labels show gold grade and drilled width.
View all 24 selected intercepts
Hole From (m) To (m) Width (m) Au (g/t) Published
SGX-13-15247.3261.414.120.1Mar 18, 2013
SGX-13-38223.2229.76.336.72Sep 26, 2013
SGX-13-20241247.76.79.01Mar 18, 2013
SGX-13-17224273.349.31.1Aug 28, 2013
SGX-13-22-A634640.56.58Mar 18, 2013
SGX-11-86420421142.7Sep 6, 2011
SGX-11-78309316.27.25.9Sep 6, 2011
SGX-13-18295307.712.72.13Aug 28, 2013
SGX-11-87517.55202.59.1Sep 6, 2011
SGX-11-90459460.11.116.9Sep 6, 2011
SGX-13-18319330.611.61.6Aug 28, 2013
SGX-13-19345354.59.51.94Mar 18, 2013
SGX-13-18254.5266.5121.47Aug 28, 2013
SGX-13-22-B644647.23.25.5Mar 18, 2013
SGX-10-03365.15369.834.683.54Dec 17, 2010
SGX-13-366571.76.72.39Sep 26, 2013
SGX-13-26314.1324.610.51.32Sep 26, 2013
SGX-11-90425.6428.52.94.3Sep 6, 2011
SGX-13-1537238191.15Mar 18, 2013
SGX-13-15346.33481.74.7Mar 18, 2013
SGX-13-38245.2249.54.31.43Sep 26, 2013
SGX-13-38297.6298.616.05Sep 26, 2013
SGX-11-8542943013.1Jul 11, 2011
SGX-10-01240.5240.90.45.39Dec 17, 2010

Widths are drilled widths as published, not true widths. SGX's 2013 releases interpreted true widths as 65% to 80% of drilled widths and reported assays uncut.

Planned drilling for expansion

Long section of the mafic tuff looking north showing the Indicated block, the block below it to be drilled from underground, and planned drill holes in the Expansion West, Expansion East and Expansion Deep areas
Mafic tuff, looking north.

Drill density

Plan map of drill line density. Drilling is concentrated around the Tully deposit, beside the magnetic break, and falls away along strike.
Drill density, looking down.

Explorable

3.3 km of strike, and a magnetic break that correlates with the mafic tuff.

Tully expansion and exploration

Satellite map of the Tully property showing the Indicated box, the Expansion West, East and Deep zones, the Exploration West, East and South zones, planned drill traces and a 3.3 km strike
Expansion and exploration zones on the Tully property.

Magnetics

Magnetics show a break that correlates with the mafic tuff.

Magnetic gradient map of the Tully property showing the magnetic break, faults and the mineralized corridor beside the break
Magnetic gradient, looking down.

Some of the potential quantities and grades disclosed are conceptual in nature, there has been insufficient exploration to define a mineral resource on all of the mineralization at the mineral property, and it is uncertain if further exploration will result in certain targets being delineated as a mineral resource.

Development road map

Illustrative schedule. Q3 2026 to Q4 2029, October 2026 planning basis.

Activity Timing
2026 MRE announced July 2026
PEA (Dec. 2026 target) Q3 – Q4 2026
Geological interpretation Q3 2026 – Q2 2027
Resource expansion drilling Q4 2026 – Q2 2028
Exploration programs Q4 2026 – Q4 2029
Permitting & baseline studies Q3 2026 – Q2 2029
Portal development Q1 – Q4 2028
Underground development Q3 2028 – Q4 2029
Bulk sample Q1 – Q3 2029
Toll milling (potential) Q2 – Q4 2029
Production decision window Q3 – Q4 2029

Conceptual planning scenario only. All future activities depend on studies, financing, permitting, engineering and access agreements. Production decision ≠ first gold.

2026-2027 objectives

  • Complete the Preliminary Economic Assessment
  • Preliminary mine and infrastructure design
  • Advance permitting process
  • Conclude ore processing options
  • Advance financing alternatives to fund production capex
  • Commence expansion and exploration drill programs
  • Continue First Nations consultations

Why operating cash flow from Tully matters

The foundation for executing the Buy Timmins, Mine Timmins strategy and delivering sustainable returns to shareholders.

  • Self-funded growth

    Tully production cash flow funds organic expansion without continuous equity raises

  • Reduced dilution

    Internal cash generation protects existing shareholders and improves capital structure

  • Shareholder returns

    Positive free cash flow enables potential dividends and direct returns of capital to shareholders

  • Balance sheet strength

    Strengthens liquidity, reduces reliance on debt, and supports a sustainable capital return policy

  • Portfolio unlock

    Supports advancement of DeSantis and other Timmins assets under the Buy Timmins, Mine Timmins strategy

Tully is not in production. Any future cash flow depends on studies, financing, permitting, engineering and access agreements.

Qualified Person

Curtis Ferron, P.Geo. (ON), independent consultant for Loyalist, who is a "Qualified Person" as defined by NI 43-101, has reviewed and approved the technical content of this page.